Custom CNC Machining Services for Durable Metal Parts
| Service | 
CNC Turning/CNC Milling/Laser Cutting/Bending/Spinning/WireCutting/Stamping/Electric Discharge Machining(EDM)/Injection Molding | 
| Available Materials | 
Aluminum, stainless steel, copper, iron, plastic, titanium alloy etc. | 
| Size or Shape | 
According to customer drawings or requests | 
| Drawing Accepted | 
PDF, DWG, IGS, STP, XT, DXF, Pro/E, STL, STEP | 
| Surface Treatment | 
Anodized, Bead Blasted, Silk Screen, PVD Plating, Zinc/Nickel/Chrome/Titanium Plating, Brushing, Painting, Powder Coated, Passivation, Electrophoresis, Electro Polishing, Knurl, Laser/Etch/Engrave etc. | 
| Tolerance | 
±0.001~±0.01mm | 
| Surface Roughness | 
Min Ra 0.1~3.2 | 
| Delivery Time | 
3-30 days after order with prepayment based on products structure and quantity | 
CNC Machining Service
Surface Treatment Options
| Physical Surface Treatment | 
Sandblasting, wire drawing, shot blasting, polishing, rolling, brushing, spraying, painting, powder spraying, silk screen printing, pad printing, water transfer printing, electrophoresis, etc. | 
| Chemical Surface Treatment | 
Bluish blackening, phosphating, pickling, electroless plating, TD treatment, QPQ treatment, carburizing, nitriding, chemical oxidation, passivation, etc. | 
| Electrochemical Surface Treatment | 
Anodic oxidation, hard anodic oxidation, electrolytic polishing, electroplating, etc. | 
| Modern Surface Treatment | 
Chemical vapor deposition (CVD), physical vapor deposition (PVD), ion implantation, ion plating, laser surface treatment, etc. | 
Quality Inspection Process
Cooperation Process
Frequently Asked Questions
Q1: Are you a manufacturer or a trading company?
A1: We are a 1500-square-meter factory located in Huizhou, China.
 
Q2: Can I get a quote without drawings?
A2: Sure, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation.
 
Q3: Will my drawings be divulged if you benefit?
A3: No, we pay much attention to protect our customers' privacy of drawings, signing NDA is also accepted if need.
 
Q4: Can you provide samples before mass production?
A4: Sure, sample fee is needed, will be returned when mass production if possible.
 
Q5: How about the lead time?
A5: Generally, 1-2 weeks for samples, 3-4 weeks for mass production.
 
Q6: How do you control the quality?
A6: 
      
- Material inspection - Check the material surface and roughly dimension
 
- Production inspection - Each production section will check the key dimensions and appearance
 
- Sampling inspection - Check the quality before sending to the warehouse
 
- Pre-shipment inspection - 100% inspected by QC assistants before shipment
 
 
 
Q7: What will you do if we receive poor quality parts?
A7: Please kindly send us the pictures, our engineers will find the solutions and remake them for you asap.
 
Customer Reviews
Our Honors